PHOTO GALLERY 17

The latest perspectives from the production line

 

This section consists of more than 50 images taken throughout 2001 by project photographer Nick Cirelli.  Our intent on these pages was to provide a more in-depth look at the fabrication process by featuring both the men and machines involved.

All images have been thumbnailed.  Click on any photograph to view an enlarged version. 

 

Adrian working on an inboard flap.

A technician works a part on the English wheel.

Blue nose slat and rudder assemblies.

Left engine "can" being fitted.

Right main landing gear door being fitted.

Mike drilling out rivets to re-fit a canopy part. 

Don working on the new belly skins.

Mike adjusting right center wing slat.

Ralph trimming up the end of the Blue Nose  lower engine nacelle.

Newly fabricated fuel tanks.

 

2001 Sabre Design Group . All rights reserved.