PHOTO GALLERY 19

The latest perspectives from the production line

 

Here we continue our look at the men and machines that make the Me 262 Project possible.

All images have been thumbnailed.  Click on any photograph to view an enlarged version. 

 

Close-up of the new engine mounts being fitted.

Austin leveling the engine can during installation of left engine.  

A group of visitors inspecting the facility.

One of the J-85 engines that will power the new Me 262s.

Crew working on left aileron and flaps.

Working on the left outboard flap.

The crew working on the right wing flaps.

Adrian and Don working on elevators for Blue Nose.

Right engine installed, and tail cone being fitted.

John making adjustments on the main landing gear actuators.

 

2001 Sabre Design Group. All rights reserved.