PHOTO GALLERY 20

The latest perspectives from the production line.

 

Here we continue our look at the men and machines that make the Me 262 Project possible.

All images have been thumbnailed.  Click on any photograph to view an enlarged version. 

 

Front view of the left engine installation.

3/4 view of the left engine.

WS of radio shelf in aft fuselage.

Mike H. fitting outboard flap on right wing.

Right wing - completed aileron rod and fittings.

Reengineered steel engine/nacelle attachment fittings (forward #1 & #2).

Overall view of Blue Nose on jacks with both engines installed.

Adrian and Mike working on nose cowl modifications.

Dave reworking the Red Nose "turtleback."

Group shot of the production crew.

2001 Sabre Design Group . All rights reserved.